Projets exécutés avec des palplanches acier d'ArcelorMittal dans le monde entier, que ce soient des murs de quais très profonds, des écrans de soutènement permanents ou de simples batardeaux.
Dernière modification : juin 25, 2024

CS - BE | Storm surge barrier, Nieuwpoort, Belgium | 2024

To protect the coast and the hinterland of strong storms, the Flemish Government approved the Coastal Security Master Plan in 2011. This plan includes the [...]

CS - BE | Storm surge barrier, Nieuwpoort, Belgium | 2024

To protect the coast and the hinterland of strong storms, the Flemish Government approved the Coastal Security Master Plan in 2011. This plan includes the construction of an anti-flood barrier at the mouth from the Yser to Nieuwpoort. After in-depth studies, a horizontal sector gate with a passage width of 38 meters was chosen.

CS – BE | Storm surge barrier, Nieuwpoort, Belgium | 2024  (0.54 Mb)

CS - DE | Sustainable BVK headquarter in Munich, Germany | 2024

Le nouveau siège de la Bayerische Versorgungskammer (BVK) est en cours de construction à Munich. Au total, 188 300 m³ de terre sont en cours [...]

CS - DE | Sustainable BVK headquarter in Munich, Germany | 2024

Le nouveau siège de la Bayerische Versorgungskammer (BVK) est en cours de construction à Munich. Au total, 188 300 m³ de terre sont en cours d'excavation. Le mur de soutènement en palplanches est réalisé avec la gamme EcoSheetPile™ Plus, produite avec de l'acier recyclé et de l'électricité renouvelable. Pour réduire davantage l'empreinte carbone, les palplanches sont louées par ArcelorMittal et seront réutilisées après le projet. Le projet s'efforce d'atteindre un niveau élevé de durabilité et a reçu le certificat "chantier durable" de la DGNB. Les défis à relever comprennent la protection contre le bruit, la logistique et la surveillance des vibrations en raison de la proximité du métro. Une fois les étages du sous-sol terminés, le rideau de palplanches sera extrait.

CS – DE | Sustainable BVK headquarter in Munich, Germany | en | 2024  (0.62 Mb)
CS – DE | Neue Zentrale der BVK, München | de | 2024  (2.65 Mb)
CS – DE | Nouveau siège de la BVK à Munich, Germany | fr | 2024  (0.22 Mb)

CD - FR | Suppression d'un passage à niveau à Agde, France | 2023

A Agde, un passage à niveau va être supprimé et remplacé, par un pont-rail au-dessus de la RD 13, la suppression du PN288 ainsi que [...]

CD - FR | Suppression d'un passage à niveau à Agde, France | 2023

A Agde, un passage à niveau va être supprimé et remplacé, par un pont-rail au-dessus de la RD 13, la suppression du PN288 ainsi que les travaux de voiries associés, contribueront à l’amélioration du quotidien des riverains et des usagers des transports, par le train ou sur la route. Le projet consiste à réaliser une enceinte étanche en rideau de palplanches et rideau mixte tubes/palplanches AZ® sous le pont-rail, afin d’assurer sa portance en phase provisoire.

CS – FR | Suppression d’un passage à niveau à Agde, France | fr | 2023  (3.14 Mb)

CS - FR | Une solution acier durable pour les parcs animaliers en France | 2022

En France, le Bioparc de Doué-la-Fontaine en Pays de Loire et le Parc animalier de Sainte-Croix en Lorraine ont choisi les palplanches acier pour créer [...]

CS - FR | Une solution acier durable pour les parcs animaliers en France | 2022

En France, le Bioparc de Doué-la-Fontaine en Pays de Loire et le Parc animalier de Sainte-Croix en Lorraine ont choisi les palplanches acier pour créer des espaces originaux pour certaines de leurs espèces. A Doué-la-Fontaine, 250 t de profils GU 8S ont été installés selon la technique dite 'en jambes de pantalon', qui alterne des palplanches de grande longueur avec des palplanches plus courtes, pour former une enceinte elliptique. Au parc de Sainte-Croix, ce sont 310 t de palplanches PU 22-1.0 qui ont été utilisées.

CS – FR | Les parcs animaliers avec des palplanches acier | fr | 2022  (0.21 Mb)

CS - DK | Erstatningshavn - Færgehavn Nord | Copenhagen | en | 2021

Le Tunnel Nordhavn devant être construit selon la méthode de la tranchée couverte, il nécessite la fermeture temporaire d'une grande partie du port de Svanemøllen. [...]

CS - DK | Erstatningshavn - Færgehavn Nord | Copenhagen | en | 2021

Le Tunnel Nordhavn devant être construit selon la méthode de la tranchée couverte, il nécessite la fermeture temporaire d'une grande partie du port de Svanemøllen. Pendant la phase de construction, les installations portuaires et environ la moitié des pontons d'amarrage pour les bateaux de plaisance seront déplacés vers le port voisin de Færgehavn Nord. ArcelorMittal a fourni en 2021 environ 1190 tonnes de palplanches AU18, dans la nuance d'acier S355GP, d'une longueur comprise entre 7,0m et 13,0m pour un brise-lames d'environ 450m de long (écran double ancré sous eau), et environ 65 tonnes de GU12N, S355GP, de 10,0m à 10,7m de long, pour un nouveau quai à Svanemøllehavnen.

CS 045 – Erstatningshavn – Færgehavn Nord – Copenhagen – DK | en | 2021  (5.22 Mb)

CS - SP | Extension du quai sud au port de Huelva, ES | 2022

Le projet d'extension du quai sud du port de Huelva, en Espagne, consiste en un quai de 525 m. Le quai est conçu pour une [...]

CS - SP | Extension du quai sud au port de Huelva, ES | 2022

Le projet d'extension du quai sud du port de Huelva, en Espagne, consiste en un quai de 525 m. Le quai est conçu pour une rétention maximale de 23,5 m avec une variation moyenne de la marée de 4 m. Les sections suivent une configuration typique avec un mur combiné HZ®-M/AZ® avant, lié à un mur d'ancrage arrière.

CS – SP | Extension of the south quay at Port of Huelva, SP | 2022-en  (2.60 Mb)
CS – SP | Extensión del Muelle Sur Puerto de Huelva, España | 2022-es  (3.33 Mb)
CS – SP | Extensão do Cais Sul, Porto de Huelva, Espanha | 2022-pt  (2.60 Mb)

CS - FR | Digue d'enclôture du polder du port de Brest, FR | 2021

Digue d'enclôture du polder du Port de Brest, de 860 m de long, à partir de cellules circulaires à base de palplanches plates AS500®

CS - FR | Digue d'enclôture du polder du port de Brest, FR | 2021

Digue d'enclôture du polder du Port de Brest, de 860 m de long, à partir de cellules circulaires à base de palplanches plates AS500®

CS – FR | Dyke for a new polder at port of Brest, FR | 2021-en  (3.48 Mb)
CS – FR | Digue d’enclôture du polder du port de Brest, FR | 2021-fr  (3.48 Mb)

CS - Nordics | Urban Development in Nordic Countries | 2021

Les structures urbaines se doivent d'être exécutées rapidement afin de nuire le moins possible aux habitants. Ce cas d'études décrit de façon simple la contribution [...]

CS - Nordics | Urban Development in Nordic Countries | 2021

Les structures urbaines se doivent d'être exécutées rapidement afin de nuire le moins possible aux habitants. Ce cas d'études décrit de façon simple la contribution des palplanches en acier à l'exécution d'ouvrages temporaires ou définitifs pour quelques bâtiments principaux construits entre 2010 et 2020 au Danemark, en Finlande, en Norvège et en Suède. La performance intrinsèque d'étanchéité et leur flexibilité ont permis de construire des batardeaux (très profonds) en bord de mer et des murs de soutènement pour des excavations (profondes).

CS – Nordiques | Développement urbain dans les pays nordiques | 2021 – en  (18.66 Mb)

CS - DK | Port de Ronne - Bornholm | 2019

Extension du Port de Rønne, la plus grande ville sur l'île de Bornholm au Danemark. Le Quai 33 est un quai de marchandises lourdes, de [...]

CS - DK | Port de Ronne - Bornholm | 2019

Extension du Port de Rønne, la plus grande ville sur l'île de Bornholm au Danemark. Le Quai 33 est un quai de marchandises lourdes, de 280 m de long, alors que le Quai 34 est un quai polyvalent de 300 m de long. Le niveau de dragage est de 13.0 m. Le Quai 34 peut accueillir des paquebots de croisère de 350 mètres de long.  Les murs de quais ont été exécutés avec les système de paroi combinée HZ-M/AZ (environ 2 600 tonnes) et avec un niveau d'ancrage à quelques mètres sous  le niveau de la mer, ceci afin de réduire les moments de flexion.

CS – DK | Port de Ronne – Bornholm | 2019 – en  (2.21 Mb)

CS - DE | Wehr Isenmühle - Heldenstein | 2020

Immediate measures on a dam at risk of collapsing with PU22 steel sheet piles

CS - DE | Wehr Isenmühle - Heldenstein | 2020

Immediate measures on a dam at risk of collapsing with PU22 steel sheet piles

CS – DE | Barrage Isenmühle, Heldenstein | 2020  (3.09 Mb)

CS - DE | Décontamination des sols - Schwarze Pumpe, Spremberg | 2020

Réutilisation de palplanches PU22 pour la décontamination par étapes de sols pollués.

CS - DE | Décontamination des sols - Schwarze Pumpe, Spremberg | 2020

Réutilisation de palplanches PU22 pour la décontamination par étapes de sols pollués.

CS – DE | Soil decontamination at “Schwarze Pumpe” site – en  (2.84 Mb)
CS – DE | Altlastensanierung Schwarze Pumpe – de  (2.83 Mb)
CS – DE | Dépollution du site Schwarze Pumpe – fr  (2.84 Mb)

CS - UK | Boston Barrier Flood Defence Scheme | 2020

Gate and flood wall protecting 14,000 properties in the city of Boston, UK – 6,260 t of steel sheet piles in high steel grades up [...]

CS - UK | Boston Barrier Flood Defence Scheme | 2020

Gate and flood wall protecting 14,000 properties in the city of Boston, UK – 6,260 t of steel sheet piles in high steel grades up to S430GP and S460AP, including some HZ®/AZ® solutions.

CS – UK | Boston Barrier Flood Defence Scheme | 2020  (1.83 Mb)

CS - BE | Railway underpass - Lokeren | 2018

Railway underpass in Lokeren, BE – 390 t of AZ®-800 steel sheet piles, using the top-down method to reduce traffic disruption to a single weekend [...]

CS - BE | Railway underpass - Lokeren | 2018

Railway underpass in Lokeren, BE – 390 t of AZ®-800 steel sheet piles, using the top-down method to reduce traffic disruption to a single weekend over the whole duration of the works.

CS – BE | Railway underpass – Lokeren | 2018  (5.25 Mb)

CS - UK | River Adur Tidal Walls - Shoreham | 2018

Flood defence scheme on River Adur to protect houses and businesses in Shoreham, UK - 4,398 t of PU28 steel sheet piles and 948 t [...]

CS - UK | River Adur Tidal Walls - Shoreham | 2018

Flood defence scheme on River Adur to protect houses and businesses in Shoreham, UK - 4,398 t of PU28 steel sheet piles and 948 t of HZ/AZ combined wall.

CS 035 | River Adur tidal walls | Shoreham | UK | 2018 – en  (1.85 Mb)
CS 035 | River Adur tidal walls | Shoreham | UK | 2018 – en  (0.27 Mb)

CS - BR | Parking souterrain Vogue - Rio de Janeiro | 2016

Parking souterrain (UCP) construit dans un nouveau quartier d'une ville située près de Rio de Janeiro au Brazil. ArcelorMittal a livré 355 t de palplanches GU 14N pour ce [...]

CS - BR | Parking souterrain Vogue - Rio de Janeiro | 2016

Parking souterrain (UCP) construit dans un nouveau quartier d'une ville située près de Rio de Janeiro au Brazil. ArcelorMittal a livré 355 t de palplanches GU 14N pour ce parking de deux sous-sols. La surface intérieure du mur est revêtue d'une peinture pour améliorer l'aspect esthétique.

CS 033 | UCP Vogue | Rio de Janeiro | BR | 2016 – en  (1.74 Mb)
CS 033 | UCP Vogue | Rio de Janeiro | BR | 2016 – pt  (1.73 Mb)

CS | DK | Ny Vesthavn - Port of Kalundborg | 2019

Quay wall with a double layer of tie-rods (one below water level) to reduce the required section modulus of the sheet piles (dredge level -15.0m). [...]

CS | DK | Ny Vesthavn - Port of Kalundborg | 2019

Quay wall with a double layer of tie-rods (one below water level) to reduce the required section modulus of the sheet piles (dredge level -15.0m). 2230 t of steel sheet piles delivered: AU 23, AZ17‑700, AZ19‑700. ArcelorMittal also supplied tie-rods with diameters 63.5 & 43.0mm, and accessories.

CS 032 | Ny Vesthavn | Port of Kalundborg | DK | 2019 – en  (3.12 Mb)

CS - FR | Épis côtiers - Cayeux sur Mer | 2015

Ces épis côtiers servent à protéger la plage de l'érosion due à la marée et aux courants marins. C'est la deuxième phase d'un projet qui [...]

CS - FR | Épis côtiers - Cayeux sur Mer | 2015

Ces épis côtiers servent à protéger la plage de l'érosion due à la marée et aux courants marins. C'est la deuxième phase d'un projet qui a commencé fin des années 1990. 2 300 t de palplanches acier PU ont été livrées en 2014 pour la construction de 24 épis, dont 3 épis doubles.

CS 027 Epis côtiers | Cayeux sur Mer | FR | 2015 – fr  (3.62 Mb)
CS 027 Buhnen | Cayeux sur Mer | FR | 2015 – de  (3.62 Mb)
CS 027 Espigones | Cayeux sur Mer | FR | 2015 – es  (3.39 Mb)

CS - DK | Unitterminal | Port of Köge

Quay wall built in the Port of Köge (Denmark) with AZ steel sheet piles in AMLoCor steel grade (more resistant to corrosion)

CS - DK | Unitterminal | Port of Köge

Quay wall built in the Port of Köge (Denmark) with AZ steel sheet piles in AMLoCor steel grade (more resistant to corrosion)

Unitterminal | Port of Köge | Denmark  (2.44 Mb)

CS - FR | Tunnel Kérino | 2018

Temporary cofferdam for the construction of a tunnel under the river Marle, in Vannes, France. It was executed in 2 phases with U-type sheet piles [...]

CS - FR | Tunnel Kérino | 2018

Temporary cofferdam for the construction of a tunnel under the river Marle, in Vannes, France. It was executed in 2 phases with U-type sheet piles and CU box piles driven down to a rock layer. Vertical micropiles were installed inside the CU box piles to increase the resistance of the toe, and additionally, battered anchors were installed at the toe. 2015 - 2016.

CS 030 Tunnel Kérino | FR | 2018  (3.35 Mb)
CS 030 Tunnel Kérino | FR | 2018 – en  (3.35 Mb)
CS 030 Tunnel Kérino | FR | 2018 – de  (3.36 Mb)

CS - DK | Ligne à grande vitesse Copenhague-Ringsted-TP4 | Copenhague | 2014

Construction d'une ligne ferroviaire à grande vitesse à deux voies entre Copenhague et Ringsted via Køge. La ligne est prévue pour accueillir des trains de [...]

CS - DK | Ligne à grande vitesse Copenhague-Ringsted-TP4 | Copenhague | 2014

Construction d'une ligne ferroviaire à grande vitesse à deux voies entre Copenhague et Ringsted via Køge. La ligne est prévue pour accueillir des trains de passagers qui pourront circuler à 250 km/h. C'est la première ligne à grande vitesses danoise, elle fait environ 60 km de long et passe par 10 villes. Plus de 4 400 tonnes de palplanches ont été livrées et installées dans des sols très durs.

CS – DK | Highspeed railway line Copenhagen-Ringsted-TP4 | Copenhagen | 2014  (2.92 Mb)

Tidal Flood Defences River Arun | Littlehampton_UK

Breakwater for "Marina Pez Vela"

In 2007 a group of local investors in Costa Rica launched the project "Marina Pez Vela". The 308 slip marina features one of the most [...]

Breakwater for "Marina Pez Vela"

In 2007 a group of local investors in Costa Rica launched the project "Marina Pez Vela". The 308 slip marina features one of the most sophisticated breakwaters ever built for a recreational marina, providing a safe harbour and hurricane protection.

Quepos, Costa Rica  (0.43 Mb)

CS - UK | The Rochester Riverside regeneration project - Kent

The Rochester Riverside is a flagship project within the Medway Council regeneration programme: a 32 hectare brownfield site with a 2.5 km frontage along the [...]

CS - UK | The Rochester Riverside regeneration project - Kent

The Rochester Riverside is a flagship project within the Medway Council regeneration programme: a 32 hectare brownfield site with a 2.5 km frontage along the River Medway selected for the development of a mixed use complex including up to 2,000 new homes, shops, hotels and cafes, offices, educational, health and community facilities and recreational areas. The entire frontage was to be rebuilt as part of the scheme which aimed to protect against flooding risk, renew the river frontage and remediate the contaminants resulting from the old Gas Works site.

CS – UK | Réaménagement des friches industrielles « Rochester Riverside » – Kent  (1.97 Mb)
CS – UK | Rochester Riverside regeneration project – Kent  (1.99 Mb)

CS - IT | North Quay Small Harbour & South Quay Large Harbour, Port of Piombino - Livorno

CS - IT | North Quay Small Harbour & South Quay Large Harbour, Port of Piombino - Livorno

Piombino Harbour | Italy  (2.68 Mb)

CS - FR | Darse de l’usine d’eau potable | Orly | 2012

Renforcement de la digue nord de la darse érigée en 1988 pour le compte de l'usine de traitement d’eau de surface en bord de Seine [...]

CS - FR | Darse de l’usine d’eau potable | Orly | 2012

Renforcement de la digue nord de la darse érigée en 1988 pour le compte de l'usine de traitement d’eau de surface en bord de Seine (près d'Orly). Un rideau de palplanches principal et un rideau d’ancrage de 390 mètres linéaires chacun assureront la stabilité de la digue pour son utilisation courante et en cas de crue de la Seine avec une darse vide, et ceci pour pendant les 100 ans à venir.

CS – FR | Darse de l’usine d’eau potable | Orly | 2012  (2.64 Mb)

Case Studies Rail and Motorway Construction

Containerterminal CT IIIa

The CTIIIa container terminal meets the high requirements of modern, reliable handling operations. Naturally, rail-support beams for new, super-large container gantries and water depths consistent [...]

Containerterminal CT IIIa

The CTIIIa container terminal meets the high requirements of modern, reliable handling operations. Naturally, rail-support beams for new, super-large container gantries and water depths consistent with the world's most gargantuan container ships wer both taken into consideration for this 95 million euro investment.

Containerterminal CT IIIa
Containerterminal CT IIIa Bremerhaven

CS - Angola | Porto Amboim - PAENAL

A new yard comprises a 460 m long quay wall and a 630 m breakwater for berthing of Sonangol product tankers. We supplied more than 3000 t of [...]

CS - Angola | Porto Amboim - PAENAL

A new yard comprises a 460 m long quay wall and a 630 m breakwater for berthing of Sonangol product tankers. We supplied more than 3000 t of steel heet piles, inlcuding 2600 t of AZ 50 in S 430 GP, 21.0 m long (2007 - 2010).

PAENAL base de construction  (2.41 Mb)
PAENAL fabrication yard  (2.40 Mb)

CS - AT | Redevelopment of a landfill - Horn

Pilot project in a landfill near Horn, Austria. The landfill had been filled for over 20 years with household waste and had reached saturation. This [...]

CS - AT | Redevelopment of a landfill - Horn

Pilot project in a landfill near Horn, Austria. The landfill had been filled for over 20 years with household waste and had reached saturation. This project increased the capacity by 130 000 m3. A vertical containment wall executed with steel sheet piles was chosen for its cost-efficiency and high watertightness.

CS – AT | Redevelopment of a landfill – Horn  (1.20 Mb)
Sanierung einer Deponie (Horn)
CS – AT | Réaménagement d’une décharge – Horn  (3.88 Mb)

Hamburg Altenwerder Container Terminal Phase 1

Hamburg Altenwerder Container Terminal Phase 1

Hamburg Altenwerder Container Terminal Phase 1

CS - Flood protection systems | Poland

CS - NL | Ligne à grande vitesse (HSL) Sud | 2007

Dans le cadre du développement du réseau de chemin de fer transeuropéen, les Pays-Bas ont commencé à construire en 2007 leur ligne à grande vitesse 'sud'. Une [...]

CS - NL | Ligne à grande vitesse (HSL) Sud | 2007

Dans le cadre du développement du réseau de chemin de fer transeuropéen, les Pays-Bas ont commencé à construire en 2007 leur ligne à grande vitesse 'sud'. Une grande quantité de palplanches acier ont été mises en oeuvre tant pour des ouvrages temporaires que permanents.

CS – NL | High Speed Line South | 2007  (2.02 Mb)

CS - Schleuse Trier | DE | 2018

Die Gesamtbaumassnahme umfasst den Ausbau des oberen und unteren Vorhafens auf 225 m Länge. In Stahlspundwandbauweise werden der obere Vorhafen, die Mittelmolen im Ober- und [...]

CS - Schleuse Trier | DE | 2018

Die Gesamtbaumassnahme umfasst den Ausbau des oberen und unteren Vorhafens auf 225 m Länge. In Stahlspundwandbauweise werden der obere Vorhafen, die Mittelmolen im Ober- und Unterwasser gebaut, sowie verschiedene Temporärbauwerke inklusive eines Anfahrdalbens im Unterwasser, der als Kreiszelle aus AS® 500 Profilen erstellt wird.

CS 028 | Schleuse Trier | DE | 2018  (2.18 Mb)

CS - FR | St Laurent du Var | 2017

Flood protection scheme in Saint Laurent du Var - France (2016-2017). Rehabilitation of around 1.6 km of an existing dyke, partially with an anchored steel sheet [...]

CS - FR | St Laurent du Var | 2017

Flood protection scheme in Saint Laurent du Var - France (2016-2017). Rehabilitation of around 1.6 km of an existing dyke, partially with an anchored steel sheet pile wall using the new AZ‑800 range.

Dyke reinforcement | St Laurent du Var | France | 2017  (1.88 Mb)
Confortement de digue | St Laurent du Var | France | 2017  (1.86 Mb)

CS - Parkings souterrains | 2008

Quelques références de par le monde de parkings souterrrains exécutés avec des palplanches en acier en tant qu'écran de soutènement permanent. Certaines de ces parois [...]

CS - Parkings souterrains | 2008

Quelques références de par le monde de parkings souterrrains exécutés avec des palplanches en acier en tant qu'écran de soutènement permanent. Certaines de ces parois ont un revêtment de peinture et ont été dimensionnées pour résister à un feu naturel sans éléments de protection additionels. Édition 2008.

Underground car Parks  (6.75 Mb)
Estacionamentos subterrâneos  (11.28 Mb)

CS 021 - BE | Hopmarkt underground car park | Aalst (2014)

Three level underground car park for 317 cars in downtown Aalst, Belgium. The sheet piles were installed in a Cutter Soil Mix (CSM) wall to [...]

CS 021 - BE | Hopmarkt underground car park | Aalst (2014)

Three level underground car park for 317 cars in downtown Aalst, Belgium. The sheet piles were installed in a Cutter Soil Mix (CSM) wall to reduce the vibrations during installation.
Around 560 tonnes of AZ-700 profiles supplied in lengths of 15 m.
Built in 2012 / 2013

CS 021 – BE | Hopmarkt underground car park | Aalst (2014)  (1.78 Mb)

CS 016 - FR | Crossing area Aresquiers | Sète (2012)

Modernization of the Canal du Rhône close to Sète, in France (south). Steel sheet piles were used to build a vertical riverbank over more than [...]

CS 016 - FR | Crossing area Aresquiers | Sète (2012)

Modernization of the Canal du Rhône close to Sète, in France (south). Steel sheet piles were used to build a vertical riverbank over more than 500 metres in order to accommodate larger vessels.

CS 016 – FR | Zone de croisement des Aresquiers | Sète (2012)  (2.85 Mb)

East Quay, Port of Piombino | Livorno_Italy

East Quay, Port of Piombino | Livorno_Italy

East Quay, Port of Piombino | Livorno_It  (2.19 Mb)

CS - ZA | Maydon Wharf - Quai n°12 | Durban | 2012

Rénovation du quai n° 12 du Maydon Wharf au Port de Durban en Afrique du Sud (2012). Environ 3 300 t de rideau mixte HZ 1180M A-24 / AZ 18-700 (S 430 GP) en longueurs de 27.3 m [...]

CS - ZA | Maydon Wharf - Quai n°12 | Durban | 2012

Rénovation du quai n° 12 du Maydon Wharf au Port de Durban en Afrique du Sud (2012). Environ 3 300 t de rideau mixte HZ 1180M A-24 / AZ 18-700 (S 430 GP) en longueurs de 27.3 m et 17.0 - 23.3 m ont été utilisées. Le nouveau mur de quai de 270 m de long a été installé devant un quai existant en palplanches acier qui a été partiellement démoli. Les profiés HZ-M ont été battus à l'aide d'un marteau hydraulique jusque au niveau de la couche de grès très compact.

CS 014 | Maydon Wharf – Quai n°12 | Durban | ZA | 2012 – en  (1.82 Mb)

Flood Defences on River Thames | Deptford Creek, UK

Deptford Creek is a tributary of the Thames in London inside the Thames Barrier. In order to protect an estimated 33 000 households from flooding, [...]

Flood Defences on River Thames | Deptford Creek, UK

Deptford Creek is a tributary of the Thames in London inside the Thames Barrier. In order to protect an estimated 33 000 households from flooding, the Environment Agency identified five Wharves along Deptford Creek for immediate replacement. Existing anchored timber pile structures were assessed to be reaching a stage where failure was imminent.

Flood Defences on River Thames | Deptford Creek, UK  (2.02 Mb)

Flood Protection | Givet, France

Launched in 2006, the flood protection program of Givet in the French Ardennes enters in its final stage. The latest construction phase began in March [...]

Flood Protection | Givet, France

Launched in 2006, the flood protection program of Givet in the French Ardennes enters in its final stage. The latest construction phase began in March 2010. This 3 km long project of over 2900 m2 is the largest of its kind ever made in France.

Flood defence | Givet  (0.58 Mb)
Protection contre les inondations | Givet  (0.58 Mb)
Hochwasserschutz | Givet  (0.59 Mb)

Halbzeit an der Saale-Elster-Talbrücke

Im Rahmen des Neubaus der Eisenbahnstrecke Erfurt – Leipzig/Halle entstand von 2006 bis 2012 südlich von Halle die längste Bahnbrücke Deutschlands. Sie sichert die Verkehrsströme [...]

Halbzeit an der Saale-Elster-Talbrücke

Im Rahmen des Neubaus der Eisenbahnstrecke Erfurt – Leipzig/Halle entstand von 2006 bis 2012 südlich von Halle die längste Bahnbrücke Deutschlands. Sie sichert die Verkehrsströme von Nürnberg nach Berlin und von Frankfurt/M. nach Dresden.

Halbzeit an der Saale-Elster-Talbrücke  (2.82 Mb)

Manalapan Seawall, Storm protection / Erosion Control | Palm Beach, Florida, USA

In late October 2012, Hurricane Sandy roared up the US East Coast and produced a storm surge that overtopped the sea walls in South West [...]

Manalapan Seawall, Storm protection / Erosion Control | Palm Beach, Florida, USA

In late October 2012, Hurricane Sandy roared up the US East Coast and produced a storm surge that overtopped the sea walls in South West Palm Beach. Steel sheet piles were utilised to repare the damaged sea walls...

CS – US | Manalapan Seawall, storm protection and coastal erosion control at Palm Beach, Florida, USA | en | 2024  (2.99 Mb)
CS – US | Hochwasserschutz von Manalapan, Sturmschutz und Erosionskontrolle in Palm Beach, Florida, USA | de | 2024  (2.78 Mb)

Harbour Construction

This brochure gives an overview of significant waterfront projects using different types of steel sheet pile solutions. The advantages of sheet piling structures in terms [...]

HMS Alliance Restoration | Royal Naval Submarine Museum of Gosport,Hampshire | UK

HMS Alliance Restoration | Royal Naval Submarine Museum of Gosport,Hampshire | UK

HMS Alliance Restoration  (1.86 Mb)

Liefkenshoek rail link Antwerp, Belgium

The Liefkenshoek rail link, currently the biggest infrastructural project in Belgium, is forging ahead in the Port of Antwerp since its start in November 2008. [...]

Liefkenshoek rail link Antwerp, Belgium

The Liefkenshoek rail link, currently the biggest infrastructural project in Belgium, is forging ahead in the Port of Antwerp since its start in November 2008. Connecting the port installations on the left bank of the River Scheldt and the Antwerp-North main railway hub on the right bank, it will provide a solution for the growing freight traffic in this area.

Liefkenshoek rail link Antwerp, Belgium  (3.77 Mb)
Liaison ferroviaire Liefkenshoek Anvers, Belgique  (1.19 Mb)

M25 “London Orbital Motorway” | UK

Widening Section 1 Junctions 16-19 The M25 is an extremely busy motorway around the Capital. It constitutes 6% of Britain’s Motorways but carries 15% of [...]

M25 “London Orbital Motorway” | UK

Widening Section 1 Junctions 16-19 The M25 is an extremely busy motorway around the Capital. It constitutes 6% of Britain’s Motorways but carries 15% of its traffic. To alleviate the resulting congestion in the North West Quadrant where key arterial motorways, such as the M40, M1and A1(M), feed into the M25, The Highways Agency requested tenders for the widening of the Motorway in these critical areas...

CS – M25 “London Orbital Motorway” | UK  (2.17 Mb)

Multimodal platform | Port of Thionville-Illange_France

Multimodal platform | Port of Thionville-Illange_France

Plateforme multimodale | Port de Thionville-Illange_FR  (2.31 Mb)

New lock of Ivoz-Ramet | Flémale, Belgium

The Ivoz-Ramet river weir and lock complex on the River Meuse near Liège lies on the Rhine / Meuse-Main-Danube trans-European priority corridor, connecting the North [...]

New lock of Ivoz-Ramet | Flémale, Belgium

The Ivoz-Ramet river weir and lock complex on the River Meuse near Liège lies on the Rhine / Meuse-Main-Danube trans-European priority corridor, connecting the North Sea with the Black Sea. The largest tonnage in the entire Walloon Region passes through this hydraulic lock...

Nouvelle écluse d’Ivoz-Ramet, Belgique  (2.16 Mb)
New lock of Ivoz-Ramet, Belgium  (2.16 Mb)

Dubai Maritime City

The Dubai Maritime City project is located close to the Rashid port in Dubai ans consists of a 2 km2 man-made peninsula providing different areas [...]

Dubai Maritime City

The Dubai Maritime City project is located close to the Rashid port in Dubai ans consists of a 2 km2 man-made peninsula providing different areas of business, housing and marinas as well as a Ship Repair facilities wich are equiped with two ship lifts.

Dubai Maritime City, Ship Lift  (1.48 Mb)

Randweg A2 Motorway. Noise barrier, The Netherlands

ArcelorMittal started promoting steel sheet pile solutions for noise barriers a long time ago. The first noise barriers were built in France and Germany over [...]

Randweg A2 Motorway. Noise barrier, The Netherlands

ArcelorMittal started promoting steel sheet pile solutions for noise barriers a long time ago. The first noise barriers were built in France and Germany over twenty years ago, but this year we would like to highlight a quite impressive project in the Netherlands.

Randweg A2 Motorway. Noise barrier, The Netherlands  (0.87 Mb)
Ecrans antibruit, Autoroute A2 « Randweg », Pays-Bas  (0.87 Mb)
Lärmschutzwand, Autobahn A2, Niederlande  (0.87 Mb)
Ekrany akustyczne, Obwodnica A2, Holandia  (0.89 Mb)

Rehabilitation of the "French Quay" | RE

Spool Base Jetty, Dande - Angola

'Angoflex’ spool base was inaugurated in March 2006 and is located in Dande, Angola. A Portuguese construction company was hired to build this jetty located [...]

Spool Base Jetty, Dande - Angola

'Angoflex’ spool base was inaugurated in March 2006 and is located in Dande, Angola. A Portuguese construction company was hired to build this jetty located north of Luanda, near the mouth of the Dande River, for the service of barges and ships for spooling pipelines. It features a unique 600 m long jetty, with water depths of up to 11 m at the bulkheads.

Spool Base Jetty, Dande – Angola  (2.33 Mb)

Port on the Danube: Straubing-Sand

Before the Rhine-Main-Danube canal was completed, the town of Straubing, neighbouring towns, and the region as a whole had already understood everything that stood to [...]

Port on the Danube: Straubing-Sand

Before the Rhine-Main-Danube canal was completed, the town of Straubing, neighbouring towns, and the region as a whole had already understood everything that stood to be gained from having a transfer facility on the Danube. They targeted construction of a port in Straubing-Sand in order to provide modern access to the extensive inland waterway system for commercial and industrial companies in the Gäuboden region.

Donauhafen Straubing-Sand

Skandinavienkai

Forecasts of passenger and freight traffic for 2010 and beyond soon showed that the capacity and productivity of the existing port facilities were insufficient. It [...]

Skandinavienkai

Forecasts of passenger and freight traffic for 2010 and beyond soon showed that the capacity and productivity of the existing port facilities were insufficient. It became clear that new berthing facilities had to be installed to meet the evolution of shipping and the future requirements for transfer speed.

Skandinavienkai

Munich Airport Extension

To cope with the massive growth in traffic, Flughafen München GmBH (FMG) and Deutsche Lufthansa AG decided to provide a second terminal and its full [...]

Munich Airport Extension

To cope with the massive growth in traffic, Flughafen München GmBH (FMG) and Deutsche Lufthansa AG decided to provide a second terminal and its full related infrastructure. Planning was based on a terminal capacity of 18 to 20 million passengers...

Munich Airport Extension

CS - FR | Caen & La Rochelle (2006)

Flood control scheme / Quay extension Protection anti-crue / Extension d'un quai maritime Hochwasserschutz / Ausbau eines Seehafenkais

CS - FR | Caen & La Rochelle (2006)

Flood control scheme / Quay extension
Protection anti-crue / Extension d'un quai maritime
Hochwasserschutz / Ausbau eines Seehafenkais

CS – FR | Caen & La Rochelle  (1.24 Mb)

CS - DE | Tar Waste Disposal - Rostock

Sealing of the tar waste disposal facility at the old gas works in Rostock, Germany.

CS - DE | Tar Waste Disposal - Rostock

Sealing of the tar waste disposal facility at the old gas works in Rostock, Germany.

CS – DE | Tar Waste Disposal – Rostock  (0.93 Mb)

CS - NL | Underground Car Park - Siemens - The Hague

This case study considers the design and construction of a multistorey car park in which steel sheet piling was used as an integral part of [...]

CS - NL | Underground Car Park - Siemens - The Hague

This case study considers the design and construction of a multistorey car park in which steel sheet piling was used as an integral part of the load bearing structure.

CS – NL | Underground Car Park – Siemens – The Hague  (1.40 Mb)
Tiefgaragen Den Haag
Parking Souterrain La Haye

CS - AT | Tube Extension - Vienna

Metro line No. 1 runs about 10 km from north to south Austria's capital city.Since 2001 work has been in progress on a 4.6 km [...]

CS - AT | Tube Extension - Vienna

Metro line No. 1 runs about 10 km from north to south Austria's capital city.Since 2001 work has been in progress on a 4.6 km long extension at the northern end. This will make Line U1 the second line to reach Vienna's city limits...

Vienna tube extension  (0.68 Mb)