Bridge piers for airplane ’taxiway’ – airport Leipzig – Halle | DE (2008)
This 191 m long and 63 m wide bridge spans over the highway BAB A14, the ICE high speed train tracks and a local route.
The construction of the nine bridge piers between the ICE train tracks and the highway started in October 2008. Vertical loads of up to 7500 kN will be transmitted to the concrete foundations, which were executed within rectangular temporary or permanent excavation pit.
Cofferdams for pillars 10, 30, 50 and 90 use hot rolled sheet piles GU 7-600 as retaining elements, while axes 20, 30, 40 and 60 – 80 will be founded within a permanent retaining wall built with PAL 3260 cold formed sheet piles.
The sheet piles were driven with an excavator mounted vibratory hammer into a sandy soil.
Project owner |
Flughafen Leipzig / Halle GmbH | Leipzig | DE |
Subcontractor driving |
PST Grundbau Berlin GmbH | DE |
Steel sheet piles |
GU 7-600 | S 240 GP / S 55 GP | 6.60 - 8.00 m | 166 t PAL 3260 | S 235 JRC | 4.80 - 5.70 m | 198 t |
Quantity |
364 t |