Lock: replacement of the existing old retaining wall | Kleinmachnow | DE
The stability of the old cantilever sheet pile wall of the access basin to the Kleinmachnow lock was at risk. A land slide caused by the measured movement of the structure would engender major obstructions of the lock’s northern chamber. The existing old retaining wall was therefore replaced by an 111 m long sheet pile wall … Lire la suite de Lock: replacement of the existing old retaining wall | Kleinmachnow | DE
Copiez-collez cette URL dans votre site WordPress pour l’inclure
Copiez-collez ce code sur votre site pour l’y intégrer